Turnkey Augmentation of Substations in Kolhapur Zone

1. Currently executing Full Turnkey contracts for Supply, Erection Testing,
Commissioning of 33/11 KV 5 MVA to 10 MVA Augmentation of Power
Transformers & allied Works at 33/11 KV Wadakshivale Substation and Balinga
Substation, Kolhapur Rural 1 division under Kolhapur Circle, Kolhapur Zone

Turnkey New 33/11kV Substation in Kolhapur Zone

2. We are nearing completion of the full turnkey contract for the supply, erection,
testing, and commissioning of a new 33/11 kV substation (1x5 MVA) and allied
works at Kokale, under the Kavathe Mahankal Division, Sangli Circle, Kolhapur
Zone.

System Improvement at Raigad Fort (DPDC 2018–19, Goregaon Division)

  • We're honored to have completed the System Improvement work of Raigad fort.
    This project, which involved the SETC of 22 kV HT Line, DTC, LT Line, was
    carried out under the DPDC 2018-19 Scheme for Goregaon Division in Pen Circle.
    We take great pride in our contribution to such an important site.

Electrification of Gharapuri (Elephanta) Island

  • We recently executed the electrification works for Gharapuri Island, a critical
    MSEDCL project situated near Navi Mumbai, with an approximate order value of ₹2.5 Cr.
    Its completion marks a historic milestone, as Elephanta (Gharapuri) Island,
    renowned for its Elephanta Caves, has finally received electricity, post-independence.

765 kV Substation Auxiliary Supply & Metering Synchronization Project for PWTL

  • we have commissioned “Auxiliary supply & metering synchronization project for New 765 kV substation” of PWTL (subsidiary of M/s PGCIL) at warora Dist Chandrapur , Maharashtra. In the power distribution.
  • In the Power distribution system, we have achieved supply, erection, testing, commissioning of 70+ power transformers, 200+ switchgears, 350+km HT cables 1400 + DT centers .

    With our expertise in this field, we are confident of meeting your requirements, We look forward to have fruitful association with your esteemed organization.

Turnkey Project

MEPL Projects division undertakes complete execution of turnkey electrification projects
from conceptualization, design, engineering, procurement, erection and commissioning
and maintenance of HT/LT cable and distribution & transmission lines, switching
stations and grid sub-stations.

The Scope of Work undertaken by the Turnkey Projects division includes:

  • Complete design, engineering and planning
  • Procurement, project management
  • Erection/ Construction/ Commissioning/Testing
  • Handing over

Project Milestones

Job DescriptionWork Done (Quantity)
Power Transformers Commissioned (Above 5 MVA)70
Power Transformers Augmented16
New Substations Erected25
New Distribution Transformer Centers Commissioned1400+
DTC Augmented500+
Indoor Transformers Commissioned240+
Ring Main Unites Commissioned195+
H.T. Over-head Lines Erection & Commissioning300+ km
H.T. Underground Cable Laying352+ km
L.T. Over-head Lines Erection & Commissioning450+ km
L.T. Underground Cable Laying550+ km
Switchgear Installations200+

Major Infrastructure Projects Executed:-

MSEDCL – Navi Mumbai Region

  • Sector 19D, Vashi: 33 kV O/D / 11 kV I/D Substation (2 × 10 MVA)
  • Sector 12B, Kopar Khairane: 2 × 10 MVA Substation
  • Ghansoli & Gharonda: 22 kV O/D / 11 kV I/D Substations
  • Sector 1, Vashi: 33 kV O/D / 11 kV I/D Substations (2 × 10 MVA) and Transformer Augmentation
  • Cable Laying: HT (11/22/33 kV, 300 sq.mm XLPE) & LT (70–300 sq.mm XLPE)
  • HT & LT Pole Erection and New DTC Installations (200 kVA – 995 kVA)
  • SETC of 33 KV double Circuit Line on 152 x152 x 13 Rmt. RSJ Poles & 0.1 ACSR Conductor ----18 KMS

Kolhapur Region

  • New Substations:
    • 2 × 5 MVA – Yadrav Industrial Estate, Ichalkaranji
    • 1 × 5 MVA – Vita (Sangli)
    • 1 × 10 MVA – Risala Road, Sangli
    • 2 × 5 MVA – Kabnoor, Ichalkaranji
    • 1 × 10 MVA – Mangaon Substation, Ichalkaranji
    • 1 × 5 MVA – Ganesh Nagar, Islampur
  • Transformer Augmentation with Power Evacuation Bays:
    • Islampur, Ashta, Shiradwad, Chandur

Special Projects

  • Chandrapur Outdoor Substations
    Executed for M/s Sunil Hi-Tech Ltd.
  • Indoor Substations at Magarpatta City, Pune
    • Phase I: 33/11 kV, 2 × 10 MVA
    • Phase II: 33/11 kV, 2 × 10 MVA
    • Phase III: 33/11 kV, 3 × 10 MVA
    • Phase IV: 33/11 kV, 3 × 10 MVA
  • Prium Energy Transmission Co. Ltd.
    Supply & Commissioning of 3 × 800 KVA transformers with OLTC & RTCC
  • Filtrum Polymers Pvt. Ltd.
    500 KVA Transformer control system with OLTC & RTCC
  • Enginetech Systems Pvt. Ltd.
    1.2 km of 22 kV 95 sq.mm XLPE cable from Pirangut Substation, including new 22 kV bay installation
  • Gloriya Project
    Bay setup at Dahanukar MSEDCL Substation

Industrial Electrification Projects

  • Filtrum Polymers Pvt. Ltd.
  • Flitguard Filters Pvt. Ltd.
  • Hodek Vibration Technologies Pvt. Ltd.
  • Dr. Babasaheb Ambedkar Spinning Mill, Nanded

Express Feeder Installation

  • KEIPL (Khed Economic Infrastructure Pvt. Ltd.)
    Executed complete supply, erection, testing, and commissioning of 33 kV OH and
    underground lines from 132/33 kV Markal Substation, including an express
    feeder system.

Engineering

Our global network features Engineering Centers in North America and Europe.

Construction

Our global network features Engineering Centers in North America and Europe.

Architecture

Our global network features Engineering Centers in North America and Europe.

Renovation

Our global network features Engineering Centers in North America and Europe.

Industrial

Our global network features Engineering Centers in North America and Europe.

Energy

Our global network features Engineering Centers in North America and Europe.

In 2020, we made new long-term commitments to sustainable development.

Sustainable development is a way to conduct our business that considers meeting the needs of all stakeholders, today and in the future.

Experience

Building our reputation on 30 years of developing communities through carefully precision design.

Certifications

Building our reputation on 30 years of developing communities through carefully precision design.

Environment

Building our reputation on 30 years of developing communities through carefully precision design.

Sustainability

Building our reputation on 30 years of developing communities through carefully precision design.

A part of us is left behind at each project we carry out, and this is something that makes us proud.

Architecture and Engineering — News and Insights.

View recent Architecture and Engineering product announcements, updates, and more.

Interested in partnering with us on your next project?

We’d love to hear from you. Please fill out the form below, and a team member will contact you as soon as possible.